Two-phase delivery: first the steel substructure with welded neck connections embedded into the wood-finished base, then the aluminum stair and railing assembly mounted on top. Each phase shipped with its own complete fabrication package; the three installation sets are shown below in build order.
Built · real installation
In the field
Installation drawings · 8 sheets
Documentation
Installation drawings shown.
Every project ships with a complete fabrication-detailed shop drawing package —
base-plate callouts, weld symbols, member-by-member dimensioning, hardware
schedules, and revision-controlled section views. The sheets below are the
installation set the on-site crew worked from.